1. It is for used specifically for critical resources.
  2. A separate run occurs for the Material Production Scheduling(MPS) items, they are not included in theMRP run.
  3. Basically, it ensures the availability of the critical resources which shouldnot hamper the production by maintaining the stock
  4. It also provides the facility to work on the production plan interactively